Commit Graph

31 Commits

Author SHA1 Message Date
jonathansadowski 973961fbd5
Add workflow for building live branches (#35344)
* Add workflow for building live branches

* Fix inadvertent newline

* Only run on PR for default types
2022-11-15 13:58:27 -06:00
rodelgc 64320a2c5c
Migrate Daily smoke tests to Playwright (#35114)
* Checkout updated files

* Checkout more files

* Remove invalid php-version input

* Add changelog

* Update pnpm-lock.yaml

* Re-add accidentally deleted filter value

* Remove unnecessary TODO comment
2022-10-21 09:07:53 -07:00
jonathansadowski 699e14d4c7
Action: Assign community PRs a reviewer (#35041)
* Community contrib action: Set output with contributor status

* Assign community PRs a reviewer

* Create configuration for community PR labeler
2022-10-13 14:19:36 -05:00
Sam Seay eb6fa6367f
Label community contributed PRs (#34971) 2022-10-10 11:34:52 +13:00
rodelgc f8ea46b086
Implement `maxFailures` and warning messages (#33977)
* Add `maxFailures`

* Intentionally fail a test for testing the failure limit

* Add changelog

* Add step to get total number of E2E tests

* Increase max failures

* Add warnings to the test summary.
Also moved some stuff around.

* Update changelog

* Use env var to set `maxFailures` value instead of hard-coding it

* Make sure env var is converted to a number

* Allow maxFailures even if not on CI

* Show incomplete e2e run warning only when E2E_MAX_FAILURES is set

* Safely escape new lines in comment body

* Fix returned stringified summary

* Remove unnecessary newline escaping

* Fix incorrect reference to E2E_MAX_FAILURES

* Minor formatting change

* Shorten warning messages

* Minor change in warning message

* Intentionally fail only 1 test

* Remove intentional failures

* Removed duplicate env declaration

* Correct pnpm command and playwright config file location

* Simplify reference to CI variable

* Remove unnecessary if condition

* Remove references to the old E2E_PLAYWRIGHT flag

* Remove references to the old E2E_PPTR_SUMMARY_PATH variable

* Test for 2 warnings

* Revert to correct locator

* Test for only 1 warning

* Pass all tests
2022-10-05 10:44:20 -07:00
jonathansadowski dc2c7a4996
Add workflow to label community PRs and Issues. (#34309)
* Add workflow to label community PRs and Issues.

* Move most of the logic for the script to check for community contributors into a separate module
2022-08-23 14:01:12 -05:00
Jamel Noel Reid b85819f2a9
Fix broken API tests (#34345)
* Bumped jest to v27

* Used jest in packaged node_modules

* Jest bump

* Removed puppeteer related code

* Updated CHANGELOG

* Added changelog
2022-08-17 11:04:41 -07:00
jonathansadowski 6670af0d64
Split changelog steps from code-freeze action (#34027)
* Split changelog script from code-freeze

* Remove hardcoded repository info from testing

* Remove generation of changelog.txt file from automation

* Correct comments and add back write of readme
2022-07-21 17:58:23 -05:00
rodelgc 9e576c2208
Upload API and E2E test reports to S3 bucket (#33843)
* Simplify if expression

* Call the new workflow in Woo Test Reports repo for publishing PR test reports

* Rename Playwright-related steps

* Archive Puppeteer screenshots only when Playwright flag is off

* Correct step name and if condition in Puppeteer steps

* Run only a single Playwright test for testing

* Correct workflow name

* Add commit message as input

* Remove invalid COMMIT_MESSAGE input

* Add root_dir input

* Update s3 root dir input

* Update link to full E2E test report

* Re-enable all Playwright tests
2022-07-14 14:15:20 -07:00
rodelgc aed4763414
Post test result summary in workflow run and in PR comment using github-actions[bot] (#33675)
* Temporarily toggle Playwright feature flag on

* Add job for test summary

* Add dummy run command

* Debug object contents

* Test getting json from prev step output

* Try toJSON()

* Test access to keys

* Try using context

* Use separate file

* Debug steps

* Try dummy job summary

* Minor job rename

* Add script for preparing job summary

* Fix context syntax error

* Correct artifact path

* List contents of artifacts folder

* inspect API summary contents

* inspect apisummary

* Remove dummy step for listing artifacts folder contents

* Parse number to string

* Correct SHA

* Try printing job summary on next step

* Create PR comment

* Minor step rename to test PR comment update

* Add another line break

* Test for puppeteer tests

* Test full Playwright test run

* Test full Puppeteer e2e run

* Fix spacing inconsistency

* Specify other test result categories in PPTR run

* Rename script file

* Minor refactor and documentation on script file

* Minor addition to script documentation
2022-07-06 11:17:51 -06:00
Roy Ho 98cf4e7160
Add PR numbers to changelog entries on code freeze process (#33627)
* Add PR numbers to changelog entries on code freeze process

* Add markdown links to PR
2022-06-28 11:15:39 -07:00
jonathansadowski 626a409e83
Release automation: generate changelog during code freeze (#33046)
* Update code freeze script to generate changelog PRs

* Add changelog file

Co-authored-by: jonathan <jonathan@jonathans-MacBook-Pro.local>
2022-06-16 14:44:07 -05:00
jonathansadowski 7eb22eabde
Update code freeze script exit code on failure (#33340)
Update code freeze exit code
2022-06-07 18:13:18 -05:00
Jonathan Sadowski bf6b16972c Update PR template and post-merge comment for changelogger 2022-04-13 10:16:33 -05:00
jonathansadowski 1cc61de404
Merge pull request #31873 from woocommerce/add/release-code-freeze
Add github workflow to automatically enforce the code freeze.
2022-02-25 16:14:49 -06:00
Jonathan Sadowski ad201cde88 Improve messaging when milestone or release branch already exist 2022-02-25 15:02:15 -06:00
Jonathan Sadowski 439ae1f17b Update code-freeze script to base its decision on latest release 2022-02-25 12:22:07 -06:00
Barry Hughes 31884d9052
Update wording. 2022-02-17 09:06:29 -08:00
barryhughes a5a712fbd0 Update references to labels in the post merge commit. 2022-02-16 15:39:20 -08:00
Jonathan Sadowski 49915391d0 Update newlines to PHP_EOL in post-request-shared.php 2022-02-11 08:32:29 -06:00
jamelreid 79a3e8f7ba Fixed typo 2022-02-10 15:22:03 -05:00
Jonathan Sadowski 18a5d3a751 Remove confusing trailing dots near version numbers; use PHP_EOL; add newline to EOF 2022-02-10 08:51:26 -06:00
Jonathan Sadowski 757209ba37 Add github workflow to automatically enforce the code freeze. 2022-02-09 13:43:05 -06:00
jamelreid 0164d219b8 Updated asset index 2022-02-04 08:16:41 -05:00
jamelreid 67f4720e0d Script to fetch an asset id for a release 2022-02-04 07:30:57 -05:00
Nestor Soriano 6fb769bc9d
Refactor the PR post-merge processing GitHub action
Common code has been extracted to a "post-request-shared.php" script.
2021-08-03 11:33:33 +02:00
Nestor Soriano b3617a3115
Extend post-merge GH action to add a comment suggestion next steps. 2021-08-03 10:07:24 +02:00
Nestor Soriano 9ffddbac1f
Use 'pull_request_target' in the automatic milestoning action
The original event used, 'pull_request', runs in the context of the
pull request. In the case of pull requests created from forks this means
that a read-only GitHub token is used for API calls, and thus the
call used to assign the milestone fails.

The fix is using the 'pull_request_target' event, which runs in the
context of the base branch, and thus with a read-write token. See:
https://docs.github.com/en/actions/reference/events-that-trigger-workflows#pull_request_target

Also, added a warning message when no milestone without a release
branch is found and thus the newest existing milestone is assigned
(this is a fallback that should normally not happen).
2021-07-29 16:47:27 +02:00
Nestor Soriano 68fcfa9cf6
Add logging to the GH action for assigning a milestone to merged PRs
If the GH API call to assign the milestone to a merged PR returns an
error, the data returned from the call will be dumped to the console,
and thus will be readable by looking at the action execution log.
2021-07-28 15:20:16 +02:00
Néstor Soriano 3ada9fc562
Change GH API query for milestones to get only the open ones.
Co-authored-by: Vedanshu Jain <vedanshu.jain.2012@gmail.com>
2021-04-19 14:46:45 +02:00
Nestor Soriano a0c965964b
Add a GitHub action for automatic assignment of milestone to merged PRs
The milestone is chosen as follows:
1. List all the open milestones with a title of "X.Y.Z"
2. Sort them desc using verson_compare
3. foreach them in order, and take the last one not having a
   corresponding release branch ("release/X.Y")
2021-04-15 17:16:00 +02:00